Supporting the Full Door Lifecycle

Door system design

From project requirements to a practical door system

A door or shutter specification is only the starting point.

For a door system to work successfully, the proposed solution needs to meet the project’s stated requirements while also working within the physical conditions of the building and being capable of manufacture and installation.

HAG’s Door System Design process brings together the information provided by the project team with specialist product knowledge and practical experience of manufacturing and installation.

From the initial enquiry or tender through to detailed CAD drawings and final approval, we review the requirements, identify potential issues, resolve technical queries and develop a project-specific door system ready for manufacture.

Specify with confidence from the outset

Every project starts with understanding the product and performance requirements established for the project.
HAG gives architects, specifiers and project teams two straightforward ways to begin.

Specify through NBS

Architects and specifiers can explore HAG’s specialist door systems on NBS Source, with technical information available to help identify products suitable for the requirements of the project.

Our range covers specialist applications including steel doorsets, fire-rated doors, fire and smoke curtains, fire shutters, security-rated doors, roller shutters, industrial and high-speed doors, automatic doors, commercial gates and loading-bay solutions.

HAG product information includes technical data, performance characteristics and specification information, while our products can also be incorporated into project specifications through NBS Chorus.

Talk to HAG’s technical team

Where the appropriate solution is not immediately clear, or a project has more complex technical, performance or installation requirements, our team can provide specialist support from the early design stages.

We can review drawings, specifications, schedules and project requirements, discuss suitable product options, identify potential technical or installation issues and help develop a suitable door system in response to the project’s established requirements.

That support can continue throughout the project — from initial specification and technical review through to survey, bespoke CAD drawings, approval, manufacture and installation.

Product knowledge. Technical expertise. Practical installation experience

Together, these help us turn the project’s established requirements into a practical door system designed for the individual building.

Our Door System Design Process

 

01

Enquiry / Tender

Drawings, specifications, schedules and project information.

02

Technical Review

Check dimensions, operation, performance standards and certification requirements. Raise queries or gaps.

03

Quotation

Proposed door system and any suitable options are established from the project requirements.

04

Order & Detailed Design

Timescales, outstanding queries, changes and technical details are confirmed. CAD drawings are developed for the specific installation.

05

Review & Approval

Drawings show exact dimensions, position and how the product sits within its environment. Client / project team reviews and signs off.

06

Manufacture

The approved project-specific design progresses to manufacture.

07

Ongoing Support

Regular maintenance keeps your door system operating safely and efficiently.

 

01 — Enquiry / Tender

For larger projects, enquiries and tenders are often received through a client’s or main contractor’s online procurement or tender system.

HAG also receives enquiries where our products have been specified or selected through NBS Source. This may be in the form of a direct enquiry or quotation request, or as part of a wider tender process.

HAG reviews the available project information, which may include specifications, drawings, schedules and supporting documentation.

At the most basic level, we need to understand the product, specification and opening sizes. The level of information provided can vary considerably between projects.

02 — Technical Review

HAG reviews the available information to understand what the door or shutter needs to achieve and whether the proposed solution is appropriate.

We look at factors such as:

  • Opening dimensions
  • Product requirements
  • Operation
  • Fire and security performance
  • Thermal or acoustic requirements
  • Relevant standards and certification
  • Fixing requirements
  • Clearances and available space
  • Structural interfaces
  • Surrounding equipment and services
  • Access and installation constraints
  • Interfaces with other systems

Where information is missing, unclear or appears inconsistent, we raise queries with the project team.
This can be particularly important where the required performance has been identified but the appropriate product or application has not been fully understood.

For example, there can be a difference between specifying a fire protection product and understanding whether the actual requirement is fire resistance, smoke compartmentalisation or another performance objective.

03 — Quotation

Once the available information and requirements have been reviewed, HAG develops the proposed door system and prepares the quotation.

Where a specification does not identify a particular solution, HAG can advise on suitable product options based on the requirements established for the project.

The quotation stage is also an opportunity to identify issues that could affect the proposed product, configuration or installation before the project progresses further.

04 — Order & Detailed Design

Once an order is placed, the project moves into detailed design.

The survey information is passed to the CAD / draughting team and provides the basis for the technical drawings. This can include the product, dimensions, fixing position, operation, motor arrangement, finish, safety equipment and other project-specific requirements.

The design process is collaborative, involving the surveyor, project team, CAD / draughting team and, where required, senior technical or sales personnel.

There can be considerable back-and-forth at this stage as information is clarified, potential issues are identified and the proposed arrangement is developed.

05 — Review & Approval

HAG produces bespoke CAD drawings showing the proposed door or shutter in situ.

Rather than simply showing a standard product, the drawings demonstrate how the system will sit within the individual building, including relevant dimensions, component positions, fixing arrangements, clearances, operation and interfaces with the surrounding environment.

The drawings are reviewed by the relevant project team and may go through several rounds of comments and revisions.
Once the technical and practical details have been resolved, the drawings are approved by the client or project team.

06 — Manufacture

Once the design has been approved and the required information is confirmed, the agreed door system progresses into manufacture.

The design process provides a clear point at which the project team has reviewed and approved the proposed arrangement before manufacturing begins.

Designing for the building, not just the specification

A key part of HAG’s design process is understanding how a door system will work in practice.

A specification may identify a fire shutter, fire curtain, security door or other specialist product, but the product still needs to work within the physical conditions of the building.

HAG’s technical review considers practical details

Opening dimensions and clearances
Is there sufficient space for the proposed system and its components?

Fixing requirements
How and where will the system be fixed, and is the proposed arrangement compatible with the surrounding construction?

Structural interfaces
Are there structural elements or other building features that could affect the position or operation of the system?

Operation and equipment
Can the proposed operating arrangement, controls and safety equipment be accommodated?

Surrounding environment
Are there services, equipment, structural elements or other features that could interfere with the door or shutter?

Installation constraints
Can the proposed arrangement be safely and practically installed within the available space and site conditions?

Interfaces with other systems
How will the door system interact with other elements of the building?

These checks help identify potential problems before they reach manufacture or installation.

Bespoke CAD drawings

HAG’s CAD drawings are developed specifically for the individual project.

The draughting team works from detailed survey information rather than simply reproducing an architect’s drawing. All the information provided on the survey is relevant to developing the drawing, from opening dimensions and fixing arrangements to operation, motor position, finish and safety equipment.

The drawing brings the proposed product into the context of the building, showing how it will sit within and interact with its surroundings.

This can highlight practical issues that may not be apparent from a written specification or an initial architectural drawing.

The drawings can show:

  • Exact opening and product dimensions
  • Product position
  • Fixing arrangements
  • Component and motor positions
  • Clearances
  • Operating arrangements
  • Surrounding structure
  • Interfaces with other equipment and systems
  • Project-specific details required for manufacture and installation

The result is a drawing that represents the individual door system, rather than simply a generic product.

Identifying problems before manufacture

Part of HAG’s design process is identifying when a proposed arrangement may not work as intended.

For example, a fire curtain may be proposed with fixing to a timber wall and surround. HAG’s technical review can identify that the proposed fixing arrangement requires further consideration and raise the issue with the project team before the design progresses.

Other potential issues can include insufficient headroom for a shutter, unsuitable fixing points, structural elements conflicting with shutter components, or surrounding equipment interfering with the proposed system.

Where a solution needs to change, HAG works collaboratively with the surveyor, CAD / draughting team and relevant senior personnel to develop an appropriate arrangement.

Where a requirement falls within the responsibility of another specialist, HAG refers the matter back to the project team so that the appropriate specialist input can be obtained.

The aim is to identify and resolve potential problems before manufacture and installation, when changes are generally easier to manage.

Specialist knowledge behind the design

There is considerably more to HAG’s design process than producing a CAD drawing.

The team combines specialist knowledge of industrial doors, shutters, fire protection and security products with practical experience of manufacturing and installation.

This experience helps HAG recognise when information may be incomplete, when a proposed arrangement needs further investigation and when a specified product may not work within its intended surroundings.

The process is therefore not simply about taking a product from a catalogue and drawing it into a building.

It is about taking the project’s established requirements and developing a door system that is practical, manufacturable and installable.

Working to the project’s established requirements

HAG develops door systems to meet the requirements established for the project.

Our role is to apply specialist product, manufacturing and installation knowledge to develop a suitable door system based on those requirements.

The wider project design team remains responsible for determining the building’s overall requirements — including where specific fire, acoustic, security or other performance is required.

For example, the required fire performance should be established through the project’s fire safety strategy and by the relevant design team or specialist. HAG can advise on products and configurations that meet the stated requirement, but does not determine where or why that performance is required within the building.

Where specialist input is required, HAG works with the project team to ensure the appropriate information is established before the door system progresses.

A collaborative process

Door system design is rarely a completely linear process.

Surveyors, project managers, CAD / draughting personnel, clients, architects, contractors and specialist consultants may all contribute information as a project develops.

Questions, revisions and additional information are a normal part of the process. On larger projects, information and drawing revisions may also be managed through shared online project portals, ensuring the relevant teams can access the latest information.

The objective is to resolve the technical and practical details before the design is approved for manufacture.

Why getting the design right matters

Problems identified late in a project can lead to changes, delays, additional costs and disruption to the wider project programme.

Identifying potential issues during the design stage gives the project team the opportunity to resolve them before manufacture or installation.

A detailed Door System Design process helps ensure that the system being manufactured is the system that has been reviewed, agreed and approved for the individual project.

From enquiry to manufacture

At each stage, HAG combines project information with specialist product and practical installation knowledge to develop a door system designed for the requirements and conditions of the individual project.

Enquiry / Tender → Technical Review → Quotation → Order & Detailed Design → Review & Approval → Manufacture

 

Discuss your project with HAG

If you have a specification, tender or project requirement that needs technical review, contact HAG to discuss your requirements with our team.

For larger contracts and projects, tenders and quotation requests are often submitted through the client or main contractor’s online tender/procurement system. HAG accesses the project information, which can include drawings, specifications, schedules and supporting documentation, and reviews the relevant information before preparing a quotation.

At this stage, HAG looks at the technical requirements and identifies any gaps or queries that need clarification. This can include dimensions, product requirements, fire or security performance, operation and other relevant technical information. Where a specification doesn’t identify a particular solution, HAG can advise on suitable options.

Once the order is placed, the project moves into the detailed design stage. Timescales are agreed, outstanding technical queries are resolved, drawings are produced and reviewed, and any changes or additional requirements are dealt with between HAG and the project team.

The process can involve some back-and-forth as information is confirmed and drawings are developed. Once the drawings have been reviewed and signed off by the client/project team, the agreed design can progress towards manufacture.

HAG reviews the specification and project information to understand what the door or shutter needs to achieve and whether the proposed solution is technically appropriate.
This can include checking requirements such as dimensions, operation, fire performance, security ratings, thermal or acoustic performance, relevant British/European Standards and certification requirements.
The level of information received varies considerably between projects. Some arrive with a clear and detailed specification, while others may provide limited information or simply identify that a door or shutter is required without defining the full technical requirements.
Where information is missing or unclear, HAG raises queries and works with the project team to establish what is required.

It varies from project to project. Some specifications are well developed from the outset, while others require considerably more technical input.

Architects, contractors and specifiers may come to HAG with questions about what product is suitable, whether a particular configuration is achievable, dimensions, performance requirements or how a door will work within the building.
There can also be a gap between knowing that a particular performance is required and understanding exactly what that requirement means in practice. HAG’s experience allows the team to identify potential issues, explain the available options and help develop a workable solution.

HAG works from the performance requirements established for the project and checks that the proposed product and configuration are appropriate for those requirements.

This can include fire resistance, security ratings, thermal performance, acoustic requirements and relevant standards or certification.

However, HAG does not determine the overall performance requirements for the building. For example, the required fire rating should be established through the project’s fire safety strategy and by the relevant fire safety professional. HAG can advise on products that meet the stated requirement, but the wider responsibility for determining where and why that performance is required remains with the project’s design team and relevant consultants.

Knowledge varies. Some projects arrive with very clear and technically detailed requirements, but there are also situations where the level of understanding of fire, security, thermal or acoustic performance is limited.

A client may know they need a fire-rated or security-rated product, for example, without necessarily understanding the different levels of performance available or what is required for their particular application.

HAG’s role is to provide technical advice and help ensure the selected product is appropriate for the requirement that has been established. It is not HAG’s responsibility to determine the wider building design requirements.

It is reasonably common for HAG to identify issues with an original specification or proposed arrangement.

Sometimes a product has been assumed to be possible when that particular product or configuration doesn’t actually exist. There can also be practical issues within the building environment — for example, other equipment such as heaters being positioned too close to a fire door.

When HAG identifies an issue, it is raised with the project team at the earliest opportunity. HAG can then explain the problem and, where possible, suggest an alternative or workable solution.

This depends on the project, but accurate dimensions, opening details, the required product and performance, operation, site conditions and relevant project requirements are all important.

The more complete the information provided at the outset, the more straightforward the design process is. However, HAG’s technical review also helps identify where information is missing or needs clarification.

Changes are managed through the ongoing technical dialogue between HAG and the project team. Revised information, drawings, queries and requirements are reviewed and incorporated into the design as appropriate.

On larger projects, this can involve multiple people and departments working from shared online tender/procurement systems, where project information and HAG’s documentation can be accessed and distributed across different locations.

The drawings are reviewed and ultimately signed off by the client/project team before manufacture.

The value is in understanding how the specified door system needs to work in practice, not simply supplying a product against a specification.

HAG combines knowledge of the products, relevant standards, manufacturing and installation with practical experience of how doors and shutters need to work within real buildings.

This means the team can identify missing information, challenge something that doesn’t appear technically achievable, raise potential problems early and help develop a workable solution.

Not every door supplier has this level of in-house technical and design capability.

Issues identified late in a project can lead to changes, delays, additional costs and potentially significant disruption to the wider project programme.

Identifying problems early — before manufacture and installation — gives the project team the opportunity to resolve them while changes are still manageable.

There is often considerably more technical work involved than is apparent from the finished door or shutter.

The process isn’t simply a case of taking a product from a catalogue and manufacturing it. HAG reviews the available project information, raises queries, works through technical details, develops drawings specific to the individual building and resolves issues before the final design is approved.

The CAD drawings show the product in situ, including its exact dimensions and how it will sit within and interact with its surrounding environment. This helps turn the agreed specification into a practical, manufacturable and installable door system.

Talk to the
door specialists

Contact Us

HAG offers a wide range of products and services, if you would like further information call 0800 072 3444 now to speak to a member of our team.

Who we are
working with

  • Rolls Royce
  • Network Rail
  • VOSA
  • MITIE
  • Vinci Construction
  • Willmott Dixon